Free Tree And Hedge Health Care Checks.  

Call 07761 537335 For The BEST Winter Deals On Tree Surgery, Hedge Cutting And Gardening Work In Cannock Lichfield Burntwood Rugeley Penkridge And All Other Local Areas

Office:- 01543684456

Mobile:- 07761537335

Demolition

 

For other uses, see Demolition (disambiguation).

Demolition of the Old Myer Building, Perth, Western Australia.

 

Demolition is the tearing-down of buildings and other structures. Demolition contrasts with deconstruction, which involves taking a building apart while carefully preserving valuable elements for re-use.

 

For small buildings, such as houses, that are only two or three stories high, demolition is a rather simple process. The building is pulled down either manually or mechanically using large hydraulic equipment: elevated work platforms, cranes, excavators or bulldozers. Larger buildings may require the use of a wrecking ball, a heavy weight on a cable that is swung by a crane into the side of the buildings. Wrecking balls are especially effective against masonry, but are less easily controlled and often less efficient than other methods. Newer methods may use rotational hydraulic shears and silenced rock-breakers attached to excavators to cut or break through wood, steel, and concrete. The use of shears is especially common when flame cutting would be dangerous.

 

The tallest planned demolition of a building was the 47-story Singer Building in New York City, which was built in 1908 and torn down in 1967-1968 to be replaced by One Liberty Plaza.

 

Contents

 

   1 Manual

   2 Building implosion

       2.1 Preparation

   3 Deconstruction

   4 See also

   5 References

   6 External links

 

Manual

A wrecking ball in action at the demolition of the Rockwell Gardens.

A high-reach excavator is used to demolish this tower block.

 

Before any demolition activities, there are many steps that need to take place — including but not limited to performing asbestos abatement, removing hazardous or regulated materials, obtaining necessary permits, submitting necessary notifications, disconnecting utilities, rodent baiting, and development of site-specific safety and work plans.

 

The typical razing of a building is accomplished as follows:

 

Hydraulic excavators may be used to topple one- or two-story buildings by an undermining process. The strategy is to undermine the building while controlling the manner and direction in which it falls. The demolition project manager/supervisor will determine where undermining is necessary so that a building is pulled in the desired manner and direction. The walls are typically undermined at a building's base, but this is not always the case if the building design dictates otherwise. Safety and cleanup considerations are also taken into account in determining how the building is undermined and ultimately demolished. Hoe rams are typically used for removing the concrete road deck and piers during bridge demolition, while hydraulic shears are used to remove the bridge's structural steel.

 

In some cases a crane with a wrecking ball is used to demolish the structure down to a certain manageable height. At that point undermining takes place as described above. However crane mounted demolition balls are rarely used within demolition due to the uncontrollable nature of the swinging ball and the safety implications associated.

 

High reach demolition excavators are more often used for tall buildings where explosive demolition is not appropriate or possible. Excavators with shear attachments are typically used to dismantle steel structural elements. Hydraulic hammers are often used for concrete structures and concrete processing attachments are used to crush concrete to a manageable size, and to remove reinforcing steel. For tall concrete buildings, where neither explosive or high reach demolition with an excavator is safe or practical, the "inside-out" method is used, whereby remotely operated mini-excavators demolish the building from the inside, whilst maintaining the outer walls of the building as a scaffolding, as each floor is demolished.

 

To control dust, fire hoses are used to maintain a wet demolition. Hoses may be held by workers, secured in fixed location, or attached to lifts to gain elevation.

 

Loaders or bulldozers may also be used to demolish a building. They are typically equipped with "rakes" (thick pieces of steel that could be an I-beam or tube) that are used to ram building walls. Skid loaders and loaders will also be used to take materials out and sort steel.

 

The technique of Vérinage is used in France to weaken and buckle the supports of central floors promoting the collapse of the top part of a building onto the bottom resulting in a rapid, symmetrical, collapse.[1]

 

The Japanese company Kajima Construction has developed a new method of demolishing buildings which involves using computer-controlled hydraulic jacks to support the bottom floor as the supporting columns are removed. The floor is lowered and this process is repeated for each floor. This technique is safer and more environmentally friendly, and is useful in areas of high population density.[2]

Building implosion

Main article: Building implosion

Demolition of a chimney at the former brewery "Henninger" in Frankfurt am Main, Germany, on 2 December 2006

The demolition of the New Haven Coliseum in New Haven, Connecticut

 

Large buildings, tall chimneys, smokestacks, and increasingly some smaller structures may be destroyed by building implosion using explosives. Imploding a building is very fast — the collapse itself only takes seconds — and an expert can ensure that the building falls into its own footprint, so as not to damage neighboring structures. This is essential for tall structures in dense urban areas.

 

Any error can be disastrous, however, and some demolitions have failed, severely damaging neighboring structures. One significant danger is from flying debris which, when improperly prepared for, can kill onlookers.

 

Another dangerous scenario is the partial failure of an attempted implosion. When a building fails to collapse completely the structure may be unstable, tilting at a dangerous angle, and filled with un-detonated but still primed explosives, making it difficult for workers to approach safely.

 

A third danger comes from air overpressure that occurs during the implosion. If the sky is clear, the shock wave, a wave of energy and sound, travels upwards and disperses, but if cloud coverage is low, the shock wave can travel outwards, breaking windows or causing other damage to surrounding buildings.[3]

 

Stephanie Kegley of CST Environmental described shock waves by saying, "The shock wave is like a water hose. If you put your hand in front of the water as it comes out, it fans to all sides. When cloud coverage is below 1,200 feet, it reacts like the hand in front of the hose. The wave from the shock fans out instead of up toward the sky."[4]

 

While a controlled implosion is the method that the general public often thinks of when discussing demolition due to its spectacularity, it can be dangerous and is only used as a last resort when other methods are impractical or too costly. The destruction of large buildings has become increasingly common as the massive housing projects of the 1960s and 1970s are being leveled around the world. At 439 feet (134 m) and 2,200,000 square feet (200,000 m2), the J. L. Hudson Department Store and Addition is the tallest steel framed building and largest single structure ever imploded.[5]

Preparation

 

It takes several weeks or months to prepare a building for implosion. All items of value, such as copper wiring, are stripped from a building. Some materials must be removed, such as glass that can form deadly projectiles, and insulation that can scatter over a wide area. Non-load bearing partitions and drywall are removed.[6] Selected columns on floors where explosives will be set are drilled and high explosives such as nitroglycerin, TNT or C4 are placed in the holes. Smaller columns and walls are wrapped in detonating cord. The goal is to use as little explosive as possible so that the structure will fail in a progressive collapse therefore only a few floors are rigged with explosives, so that it is safer (fewer explosives) and costs less. The areas with explosives are covered in thick geotextile fabric and fencing to absorb flying debris.[6] Far more time-consuming than the demolition itself is the clean-up of the site, as the debris is loaded into trucks and hauled away.

Deconstruction

Main article: Deconstruction (building)

 

A new approach to demolition is the deconstruction of a building with the goal of minimizing the amount of materials going to landfills. This "green" approach is applied by removing the materials by type material and segregating them for reuse or recycling. With proper planning this approach has resulted in landfill diversion rates that exceed 90% of an entire building and its contents in some cases. In addition, it also vastly reduces the CO2 emissions of the removing of a building in comparison to demolition.[7]

 

The development of plant and equipment has allowed for the easier segregation of waste types on site and the reuse within the construction of the replacement building. On site crushers allow the demolished concrete to be reused as type 1 crushed aggregate either as a piling mat for ground stabilization or as aggregate in the mixing of concrete.

 

Timber waste can be shredded using specialist timber shredders and composted, or used to form manufactured timber boards, such as MDF or Chipboard.

 

Safety is paramount, a site safety officer is usually assigned to each project to enforce all safety rules and regulations.

Garden Clearance-Tidy Lichfield Cannock Rugeley Burntwood Shenstone Brownhills and all local areas

We can deal with all types of Garden Clearance from small to large scale, removing all debris on a professional level, working to BS 3998:2015.  

Office:- 01543684456Mobile:-07761537335

 

Below is a small garden tidy we did locally in Burntwood. The job involved weed removal, mowing, shrub reductions and patio clean up.

1150976_10201960981252648_1743233503_s
DSC02746
DSC02761
Mark Wodalls hedge before
Mark Woodall hedge During
Mark Woodall hedge after 2

Below Conifer reduction at Hednesford

Please Click the orange box to add our web feed

Dragonfly Tree And Garden Services

Burntwood

Nr Lichfield

Staffs

 

01543 684456

 

07761537335

© 2018 Dragonfly Tree and Garden Services

Tree Surgeons Lichfield, Cannock, Burntwood, Whittington, Heath Hayes, Brownhills, Rugeley, Little Haywood, Longdon, Armitage, Shenstone, Little Aston,  Gentleshaw, Hednesford, Norton Canes, Cheslyn Hay, Penkridge, Brocton, Acton Trussell, Brewood and all other local areas

gold star 1
gold star 1
gold star 1
gold star 1
gold star 1

Tree / Hedge Cutting / Trimming / Reducing

Tree / Hedge Removal

Dangerous Tree / Hedge Removal

Tree / Hedge Preservation

Cable Bracing

Tree / Hedge Health Inspections

Cable Clearance

Wind Damaged Tree / Hedge Removal

Ivy / Vine Removal / Trimming

Lawn Mowing / Edging / Weeding

Patio Weeding

Garden Maintenance

Seasoned Logs For Sale

Free Tree And Hedge Health Care Checks

RSS Feed